BUILD YOUR PARK
BUILD BUILD
Construction goes smoothly when planning and funding are already settled. Certified Texas playground installation on time, on budget, and built to last. Construction goes smoothly when planning and funding are settled. Certified installation, on time and on budget.
Construction is a schedule problem. We plan around weather, cure time, and inspections.
01 Plan 02 Fund 03 Build 04 Play Built with care, on schedule.
Plan . Fund . Build . Play . Construction is a schedule problem. We plan around weather, cure time, and inspections.
You are here
{{ s.here }}
Three stages to opening day.
Every build follows the same order. What changes is the site, so we plan for it before the first shovel.
{{ m.n }}
{{ m.title }}
{{ m.line }}
Stage durations vary by site conditions, weather, drainage, permitting, and manufacturer requirements.
Safe from groundbreaking to closeout.
Careful work at every step protects your community and our crews, from the first utility locate to the final walkthrough.
‹
›
{{ r.title }}
{{ r.effect }}
{{ r.detail }}
Build with confidence.
Build sheets
Two pages per build phase. Print it, mark it up, bring it to the site.
White papers
Longer reads for the questions that shape a whole project.
Build with confidence. Two-page sheets for each build phase. Print one, mark it up, and bring it to the site.
Planning Documents ▾ Pre-Groundbreaking Checklist Everything to confirm before the crew arrives on site. Request → Site Preparation Grading, drainage, and base depth by surfacing type. View → Utility Coordination 811 locates, permits, and who calls when. View → Construction Timeline Lead times, cure time, and the order of operations. View → Footing Specifications Depth and diameter by structure and soil condition. View → Installation Checklist What the crew verifies before surfacing goes down. View → ASTM Standards The standards that apply, in plain English. View → Accessibility Verification Routes, ramps, and transfer points, measured. View → Project Closeout The documents that should exist on handoff day. View → White Papers ▾
A good plan deserves a strong finish.
We’ll help turn the approved scope into a clear path to installation.
Playgrounds, splash pads, and recreation spaces built across Texas. Recreation spaces built across Texas.
What We Build ▾
Project Guide ▾
About Play RGV
Start a Project
Stay in the loop
Get occasional updates on grant opportunities, purchasing programs, safety standards, new products, and ideas for planning better recreation spaces. Grants, safety updates, and new products.
Subscribe
A few emails a year.